FACTS & Frequently Asked Questions

Why are the lights on at our new build site when no workers are there?

Hallams, the contractors gave the following response:-

 

We pay for the electrics (currently off generator) and the lights are PIR activated for security. We also had full time security over Christmas when the lights were on full time.

 

Is the council using alternative greener methods to produce electricity in the new Council offices?

It is acknowledged that the full range of green technologies has not been adopted although it is important that the reasoning behind this is understood.

 

There is the commercial standpoint in terms of payback periods.  Although the increasing cost of fuel will improve these over time many technologies such as photovoltaic’s currently have a payback beyond their life.  This is a symptom in part of the high capital investments required.

 

In demonstrating value for money to the taxpayer consideration must be given to such analysis and although increasing costs can be modelled this introduces an element of risk to any investment.

 

As has been reported the vast majority of the investment for the development has been funded through an insurance settlement.  Which provides funding for a like-for-like replacement and thus green technologies would not fall within this criteria.

 

This aside in designing the building the introduction of green technologies was considered from a commercial standpoint to determine if it could be funded as part of the global insurance settlement.  Through this process the introduction of solar panels to heat the water required in the building has proved viable with a payback of less than 10 years.

 

In addition to the solar hot water the building itself has been designed to be green and minimise the energy it consumes.  So for example the building is naturally ventilated eliminating air conditioning in the open plan offices.  With the orientation of the building itself minimising the heat gain and loss and in turn the need to heat or cool to maintain comfortable working temperatures.

 

So on the surface it may seem minimal consideration has been given to being green but in designing any new building this is unavoidable and something the project team have been fully engaged with our architects and engineers.

 

The energy efficiency rating of the building, similar to that you may see on white goods such as fridges, is expected to be a B.

 

Will the new Council offices have a sprinkler system?

Archial, the Council's appointed design team for the project gave the following response:-

 

In our experience this suggestion has been explored on a number of projects including commercial office buildings for international operators such as Marconi and local authorities. Generally the end conclusion has been that when balancing risk and cost it has never been a viable option for the following reasons:

 

1) The physical implications on the site planning has been significant with the requirement for sprinkler tanks etc having a major visual impact on the projects.

 

2) Costs of the sprinkler system have generally vastly exceeded the savings in insurance premium as a result of having them.

 

3) Sprinklers do not prevent full loss in the result of a fire, often the implications of the sprinklers activating will have a significant business impact as it is likely that furniture, soft furnishings, decoration and IT will all be effected by the activation, the main thing it protects is the building fabric.

 

4) Accidental or activation through malfunction can have a similar effect to the above and this has happened in the past.

 

5) Key areas of risk in the building will be protected ie comms rooms and other areas of risk can be reviewed as the project progresses for example sealed fire resisting post boxes can be considered with built in extinguishers.

 

6) The installation of a sprinkler system means that supply pipes will need to be passed through the raised access floors with power and data, and whilst some systems in there dormant state will sit dry this may present an additional risk.

 

The Building will be designed in accordance with the Building Regulations and therefore guidance contained within the Approved Document B and/or the current British Standards where appropriate, will be followed.

 

In accordance with the Approved Documents, the building is considered to be in Purpose Group 3 - Office.

 

Due to the height of the building, in accordance with the Statutory Guidance documents, sprinklers are not required in order to satisfy the functional requirements. Note that sprinklers would be required if the building height exceeded 30m.

 

Where is the Town Station site located?

The Burton Street site is situated to the south of Melton Mowbray town centre and market square and is shown on the map below. The site benefits from being directly adjacent to the railway station, which is located directly to the south.

 

Town Station Site map    Town Station Site Plan

 

How will the Town Station site be developed?

The site is really important and any development needed o be given careful consideration. The site already had a valid planning permission for retail, office and housing development. As the Council now owns the entire site it can control development and take these issues into account more than a developer would necessarily wish to do.

 

Who will be sharing the Town Station site with you?

We have an agreement with the County Council and Probation Service.  Others including the PCT, voluntary sector and Police looking at the options for joint-working in terms of office requirements.  We would anticipate that they will fully fund their own space requirements, probably through rental payments, and that this will not be a pressure on our budget.

 

The access in and out of the site is not very good, how will this be improved?

As part of the planning application a junction improvement scheme was submitted including analysis of traffic flows.  This identified that the impact on traffic flows would not be significantly above those already occurring.  In order to improve the access in and out, a new access road is being built and this involves building on the land we have purchased to enable an improved access to the railway station, Town Estate car park, Council Offices and Pay and Display car park.

 

We have already had informal feedback from our Public Consultation group that this is an area that the public will be particularly interested in and we will provide detailed information as it becomes available.

 

What is the future of the Pay & Display car park on the site?

This would, in the majority, be retained at this current time.

 

What about the land conditions, highways, access, archaeological site sensitivity, accessibility, flooding?
A detailed report was produced by Maber Associates Ltd. (architects) looking at these issues in detail and which has been considered by Councillors. This covered highways, planning, flooding, archaeology, site investigations, ecological issues etc. Download the feasibility report here:

Further detailed reports were submitted as part of the planning application, click here for more information.

 

Following completion of the Demolition the Main Contractor has now been appointed and has commenced on site.

 

What sort of issues have you had to deal with as part of the design?

The site has natural constraints and issues associated with it such as:

1. Its orientation meaning that the southern side most exposed to the sun will probably require solar protection and the northern aspect could therefore accomodate more glazing.

2. Mucky Lane has lots of services that run underneath it that we are not proposing to move and this limits the extent of the site for development directly next to the railway station.

3. In modern design terms you first need to decide how to cool a building eg passively or mechanically (airconditioning). The Council wishes to have as efficient a building as possible with low running costs and this supports a more passive cooling system.

 

Many of these issues were explored as part of our inital consultation process here.

 

Frequently Asked Questions (Archive)

 