Frequently Asked Questions.

 

 

 

What are the Building Regulations? 
The Building Regulations are legal requirements aimed at achieving minimum standards of construction. The main purpose of the Regulations is to safeguard the health and safety of people in or about buildings. They are also concerned with energy efficiency and access and facilities for disabled people.

 

Back to the top.

 

 

What is the difference between building control and planning? 
Very often people are confused by the need to obtain 'approval from the council' for their building work. The fact is that Building Control and Planning are two separate types of service that control building works. For the majority of proposed building works two separate applications are necessary because you will require both Building Regulations and Planning consent.

 

Planning 
In general terms, the Planning Service controls the appearance of buildings, their effect on the general environment and neighbouring properties and the correct use applied to the land. Whether planning permission is required or not is defined in complex statutory regulations, although some small-scale development is exempt. The best advice we can give is to contact the planning officers who are here to help you and can advise whether planning permission is needed for your proposal.

 

Building control 
Again in general terms, the building control service ensures that buildings are constructed properly and in accordance with current standards & regulations. This is done by checking the information provided with the application e.g. plans and then inspecting the construction work as it progresses on site. Principally the building regulations:

Safeguard the health and safety of people in and around building

Conserve energy

Provide access and facilities for people with disabilities

The vast majority of building works requires building regulation approval with only a small amount of minor works and structures being exempt. If you are in any doubt whether or not your proposals require approval contact you local office.

 

Back to the top.

 

 

How do I obtain Building Regulation approval? 
There are two ways of making an application for domestic work (see Full plans or Building Notice application.) Application forms are available from your Local Building Control Departments or by downloading the relevant forms from this web site, on line applications can also be made from here.

 

Back to the top.

 

 

Full plans or Building Notice application? 
Full plans 
Prior to the commencement of work on site you will need to submit two copies of plans showing full constructional details of the proposed scheme together with the completed form and appropriate charge. Unless you have a thorough working knowledge of the regulations, and building construction in general, it is best to seek professional advice in this regard.

A building control officer will check your application and if the plans show compliance with the regulations they will be approved. Should amendments or further information be required, you will be asked to submit revised details in order that they may approve your scheme.

There is a statutory time limit of 5 weeks (extendable to 2 months with agreement) in which they must determine your submission although their aim will always be to process your application as quickly as possible.

Site inspections will be made when work proceeds but with the Full Plans approach you have the assurance that providing the work is carried out in accordance with the approved plans the regulations will be satisfied.

 

Building notice 
If you choose this option, no detailed plans are required as the emphasis is on site supervision. You simply need to fill out a form advising your Local Building Control Office of your intention to carry out building work and supply a plan indicating the position and size of the extension and provide the appropriate charge. The Building Notice is suited to simple domestic schemes such as internal alterations and small extensions. Plans/details will be requested in some situations (e.g. structural calculations for loft conversions/through rooms etc.) but only when necessary.

Without plans there is no detailed check of the work before it is carried out and therefore no official decision notice is issued. Whilst the Building Control Surveyor will try to anticipate potential problems it is ultimately the responsibility of the person carrying out the work to ensure that the requirements of the regulations are satisfied.

 

Back to the top.

 

 

If I make a Building Notice application, will the Building Control Officer tell me how to carry out the work during his first visit?
No - while we are always willing to offer help and advice you should not expect to use the Building Control Officer as a substitute for an Architect or designer.

If you are not confident that you (or your builder) are fully conversant with the requirements of the regulations, then we would strongly advise that you do not use a Building Notice application.

 

Back to the top.

 

 

If you do not check plans on Building Notice applications, why are the fees the same as for Full Plans Applications? 
As no plan check is made, additional reliance is placed on the inspection stage of the process to ensure the Building Regulations are complied with. This translates into a requirement for either more inspections being necessary, or the inspections made taking longer than would be the case with a Full Plans application; hence the total cost is the same.

 

Back to the top.

 

 

When Can I start work? 
You may start work after you have submitted either a Building Notice or a Full Plans application and at least 2 days notice has been given of your intention to commence work (preferably in writing). It will however be at your own risk until either the Building Notice has been accepted or approval issued in the case of a Full Plans application.

Either you or your builder should then notify the Council at each of the stages listed below (where appropriate):

  • Commencement of work
  • Foundation excavations prior to concreting
  • Foundation concrete
  • Oversite (ground floor) prior to concreting
  • Damp proof course prior to covering
  • Foul water drainage prior to backfilling
  • Surface water drainage prior to backfilling
  • Structural floor and roof timbers prior to plaster-boarding
  • Occupation prior to completion
  • Completion of works

The Building Control Surveyor may also request notification at other stages of the work that are not specifically included within the Regulations e.g. roof timbers.

The above statutory framework for inspections is obviously not appropriate for all types of work. For example, in the case of loft conversions, after the commencement visit, inspections of the structural elements will normally be required prior to covering up.

 

Back to the top.

 

 

What do I do on completion? 
When your work is finished you should contact your Local Building Control Office to arrange a final inspection. We recommend that any final payments to builders only be made after the Building Control Surveyor has carried out a satisfactory completion inspection. Once they have confirmed that your work meets the required standards, they will be pleased to issue you with a completion certificate.

 

Back to the top.

 

If all goes well when should I pay the builder? 
We always recommend that you contact us and ask if there are any outstanding items that we are not happy with before you make any payments. So please do not hesitate to phone and check that we have been along to inspect and that we are satisfied that the work complies with the building regulations.

 

Back to the top.

 

 

Does the approval of plans permit me to build over the boundary onto my neighbour's property? 
No. We are not responsible for establishing boundaries between properties. If you find that your neighbour has built over your boundary we suggest that you discuss the matter with them. If you are unable to resolve the problem you should then seek legal advice from a solicitor.

 

Back to the top.

 

 

What do I do if my neighbour wants to do work to my party wall? 
Party walls come under separate legislation, which the Council cannot deal with. We're happy to give you general advice but you may need to contact a specialist party wall surveyor.

A copy of the Party Wall Act 1996 can be viewed by clicking on this link.

 

Back to the top.

 

 

What happens if my builder damages my neighbour's property? 
Your builder should have adequate insurance to cover damages to property and injury to people. You should make sure that your builder has this type of insurance. We have no control over this aspect of the works and we would advise any aggrieved parties to seek the advice of a solicitor.

 

Back to the top.

 

 

Do we get value for money?
The Council employ experienced and professional Building Control Officers to deal with your application, who between them have a wealth of local knowledge. Our officers spend a considerable amount of time checking your plans, advising on how to comply with the Regulations and, in particular, carrying out regular site inspection visits. Remember that the charge is fixed no matter how difficult your application may be to deal with and covers you for as many inspection visits as the Building Control Officer feels necessary - be that 1 or 100.

We are easy to contact, give expert advice and respond the same day to your requests for a visit - few other organisations can offer that degree of service. If you compare our charges with those of calling out a professional surveyor just once or twice, I hope you will agree that they are, in fact, more reasonable than they at first appear.

 

Back to the top.

 

 

Is a Completion certificate the same as a guarantee or warranty? 
No. The completion certificate simply confirms that, as far as the Council have been able to ascertain, the work on-site complies with the current Building Regulations. This means that inspections will have been carried out at the appropriate times, and that any problems found were put right. The Council do not provide a guarantee or warranty on the work, although we hope to be able to offer such a scheme (at extra cost) in the near future.

If you are buying a new or altered property, always make sure your solicitor checks that a completion certificate has been issued for the work. This is particularly important as if we later find defects; it may be you who is responsible for correcting them rather than the previous owner!

 

Back to the top.

 

 

What if things go wrong? 
If problems arise during the progress of works our officers will do their best to help find solutions, and will be happy to offer advice to both you and your builder.

Ultimately however the Building Control service is not a warranty organisation and if the building work fails to meet your needs or expectations your redress would be against your builder, not the Council. For this reason you should take great care in selecting a builder who is reliable and who is still likely to be around if you have problems two or three years into the future.

 